I will cover sizing for backup repositories in a future post. Remember these figures are general guidelines ensure you account for time in your project to test and optimise resource allocation. In effect this setting will determine the number of disks and therefore VMs that can be backed up at once The proxy server is sized per task, a task is defined as a VM hard drive. Up to 25 concurrent jobs – 8 CPUs, 16GB RAM.Up to 50 concurrent jobs – 4 CPUs, 8GB RAM.Up to 25 concurrent jobs – 2 CPUs, 4GB RAM.Logs – 3 GB log files generated per 100 protected instances, with a 24 hour RPO.4 GB RAM for every 10 actively running jobs.1 CPU core for every 10 actively running jobs.Veeam Component Resource Requirements Backup Server

#Veeam backup server requirements update#

Then retest until you are satisfied with the result I'm about to migrate the existing Veeam Backup server v9.5 Update 1 into new Physical Server since I want to utilize Storage Array Snapshot.

  • Exact requirements will be specific to your environment, start with the recommended values access if it is meeting your requirements and amend as necessary.
  • Staggering jobs can help to reduce resource requirements since some components are sized on the basis of number of concurrent jobs.
  • Although this will of course be dependent on an any other bottlenecks
  • The best practice guide estimates that doubling resources will half the backup window.
  • The sizing information given in the user guide are minimums.
  • For example if the server is both a Proxy and Tape server you will need to add the resource requirements for both together
  • Sizing requirements are specific to each Veeam infrastructure component.
  • Each disk that is backed up is a task this is not a per VM measure
  • Some sizing requirements refer to “Per Task”.
  • All sizing information is contained in the user guide and best practice guide.
  • Some considerations when sizing your Veeam environment:
  • Number of VMs and disks to be protected and number of retention points required will also be needed for disk capacity planning which I will cover in a future post.
  • #Veeam backup server requirements software#

    Can either be calculated assuming change rate as 10% of your total data size or from existing backup software

  • Daily rate of change – This is required to understand the size of an incremental backup.
  • #Veeam backup server requirements full#

    Size of source data – Required to calculate size of full backup.In order to plan your Veeam backup sizing you will need to gather some information The key components of the Veeam infrastructure you will have to consider in your sizing exercise are as follows: During VeeamON I attended a session on Veeam sizing by Tim Smith, I have pulled together my notes from the session and reviewed the Veeam documentation to give the following template for considering Veeam sizing decisions.

    #Veeam backup server requirements free#

    Correctly sizing the infrastructure to ensure that each of the Veeam infrastructure components servers has sufficient resources to perform its role will allow an optimally configured and trouble free environment. Turns out the version of the module affected (svhdxflt.sys for KB3068444 and csvfs.sys for KB2068445) were already at a higher version level than those in the hotfixes.One of the key decision you have to make in planning a new Veeam deployment is in sizing the infrastructure. The pre-requisites (KB2919355) are already installed.ĭoes anyone have any thoughts or recommendations? Can we force the installation? Should we?.The update is for the correct architecture (they were installed successfully on the other cluster nodes).I have confirmed that none of the reasons given in R740 with 24 disks for storage, I think 2.4 10k are the largest drives. R540 (2) flex bay disks for OS, (12) high capacity disk would provide the most retention. Other two nodes were installed from RTM Volume Licensing media some time ago. Depends on if you plan on using the backup server to run VMs in the event of an outage, as well as retention requirements.

    #Veeam backup server requirements windows#

    This time the source media was the Windows 2012R2 with Updates (from MSDN as the Volume Licencing version not available at the time). The only likely difference between this server and the other two nodes is that it was recently rebuilt from scratch. I am having the same problem, but with only one server that is a node in a three server Cluster.